API 581 / API 580

Risk-based inspection (RBI)

Probability of Failure × Consequence of Failure → next-inspection date and method. Higher risk = more frequent + more sensitive inspection.

Inputs

yr
MPa
°C
mm
mm
mm/yr
kg

Results

API 581 — 5×5 risk matrix
54321ABCDEPoF →CoF →
PoF (rows, 1–5) × CoF (cols, A–E). Top-right = highest risk.
Enter inputs and click Compute RBI.