API 581 / API 580
Risk-based inspection (RBI)
Probability of Failure × Consequence of Failure → next-inspection date and method. Higher risk = more frequent + more sensitive inspection.
Inputs
yr
MPa
°C
mm
mm
mm/yr
kg
Results
API 581 — 5×5 risk matrix
Enter inputs and click Compute RBI.