FPSO topsides — turret loop
Fleet integrity assessment
API 581Pre-loaded with 5 turret-loop assets (TR-101 turret swivel · R-201 production riser · V-301 1st-stage separator · E-302 gas-dehydrator JT cooler · P-401 PWI pump). Sour + 3-phase + AIV + cryogenic + motion fatigue all in one fleet — edit any asset to match your topside, then run API 581 RBI.
Build your fleet
Pre-loaded template ready to assess as-is, or edit individual assets to match your operation. Backend runs API 581 RBI per asset, pulls the 5×5 matrix image inline, computes verdict + inspection interval + recommended NDE method.
Fleet (5 assets)
| Tag | Type | Age (yr) | P (MPa) | T (°C) | Wall (mm) | Sour | Last insp. | |
|---|---|---|---|---|---|---|---|---|
| TR-101 | vessel | 8 | 70.0 | 95 | 38.0 | ✓ | 2023-12-05 | |
| R-201 | piping | 8 | 40.0 | 85 | 27.5 | ✓ | 2023-08-20 | |
| V-301 | vessel | 8 | 8.0 | 80 | 32.0 | ✓ | 2023-05-10 | |
| E-302 | heat_exchanger | 8 | 6.0 | -30 | 14.0 | – | 2023-03-01 | |
| P-401 | pump | 8 | 25.0 | 80 | 22.0 | – | 2023-10-12 |