FPSO topsides — turret loop

Fleet integrity assessment

API 581

Pre-loaded with 5 turret-loop assets (TR-101 turret swivel · R-201 production riser · V-301 1st-stage separator · E-302 gas-dehydrator JT cooler · P-401 PWI pump). Sour + 3-phase + AIV + cryogenic + motion fatigue all in one fleet — edit any asset to match your topside, then run API 581 RBI.

Build your fleet

Pre-loaded template ready to assess as-is, or edit individual assets to match your operation. Backend runs API 581 RBI per asset, pulls the 5×5 matrix image inline, computes verdict + inspection interval + recommended NDE method.

Fleet (5 assets)

TagTypeAge (yr)P (MPa)T (°C)Wall (mm)SourLast insp.
TR-101vessel870.09538.02023-12-05
R-201piping840.08527.52023-08-20
V-301vessel88.08032.02023-05-10
E-302heat_exchanger86.0-3014.02023-03-01
P-401pump825.08022.02023-10-12