Refinery CDU bottoms loop

Fleet integrity assessment

API 581

Pre-loaded with 5 typical bottoms-loop assets (V-101 atm bottoms drum · P-101 pump suction · E-101 ATM/preheat · E-102 VR/BFW exchanger · T-101 slop tank). Edit each one to match your operation, add or remove assets, then run API 581 RBI on the whole fleet.

Build your fleet

Pre-loaded template ready to assess as-is, or edit individual assets to match your operation. Backend runs API 581 RBI per asset, pulls the 5×5 matrix image inline, computes verdict + inspection interval + recommended NDE method.

Fleet (5 assets)

TagTypeAge (yr)P (MPa)T (°C)Wall (mm)SourLast insp.
V-101vessel180.435014.02022-04-10
P-101piping150.53207.12023-09-22
E-101heat_exchanger121.028012.52023-01-15
E-102heat_exchanger121.538012.52022-11-08
T-101tank250.16011.22021-06-30